Court of AppealDismissedCourt of Appeal at Mombasa, appeal from Mombasa Environment and Land Court Case No. 234 of 2017

Lumunge v China City Construction LimitedChina City Construction Limited & 2 others (Civil Appeal E007 of 2023) [2026] KECA 330 (KLR)

Court of Appeal of Kenya
27 February 2026
5,010 words in judgment
View original judgmentRead on Kenya Law Watch case
AI-assisted case brief
·~20 min to read original · ~4 min brief

The bottom line

#

Kenya's Court of Appeal confirmed that land within a designated road reserve can be used for road expansion without compensation.

What this practically means

#

Executive summary

#
The Court of Appeal at Mombasa (Murgor, Laibuta and Ngenye-Macharia, JJA) dismissed an appeal against the decision of Matheka, J. in Mombasa ELC Case No. 234 of 2017 delivered on 27th September 2022, in which the appellant's claim for Kshs.14,925,000 for alleged trespass and compulsory acquisition of Plot No. L.R. 4118/340 in Taveta Town was dismissed. The appellant, registered owner of the suit property, alleged that the contractor and KeNHA encroached on his land while constructing the Mwatate-Taveta (A23) Road and Taveta-Voi Bypass. The Court, sitting as a first appellate court under rule 31(1) of the Court of Appeal Rules, 2022, re-appraised the evidence and framed two issues: whether the suit property was compulsorily acquired within the law, and whether the appellant was entitled to compensation. Scrutiny of the survey maps revealed a 30-metre road reserve abutting the property, an automatic reservation for future road expansion. The road expansion occurred within that reserve, leaving the suit property intact, so no compulsory acquisition or gazettement was required and no compensation for land was due. The appellant, who had built a petrol station on the road reserve, was held to be the encroaching party, and the Kshs.6,624,600 he received for structures was an undeserved benefit. The trial judge's findings were affirmed; the appeal was dismissed with costs to the 1st and 3rd respondents.

Questions the Court framed

#

The issues the Court set itself to decide, in its own words.

  1. 1.Whether the appellant's suit property was compulsorily acquired within the province of the law
  2. 2.Whether, to that end, the appellant was entitled to compensation

Key legal issues

#
01

Whether the suit property was compulsorily acquired so as to trigger a right to compensation under Article 40(3) of the Constitution

Holding

No compulsory acquisition occurred because the road was constructed on the pre-existing 30-metre road reserve, not on the appellant's land; the suit property remained intact and was never gazetted for acquisition.

Reasoning

Scrutiny of the survey maps F/R214/47, 312/16 and 136/174 showed a 30-metre-wide road provision on either side of the highway abutting the suit property. The road expansion took place within that designated reserve, an automatic reservation for the road authority, so no gazettement or acquisition of the appellant's parcel was necessary. Compensation already paid (Kshs.6,624,600) covered structures erected on the reserve.

p. 9
02

Whether the appellant, having built a petrol station on the road reserve, was entitled to compensation for the land

Holding

No. The appellant was the encroaching party, not the victim of trespass, and his receipt of Kshs.6,624,600 for structures on the reserve was an undeserved benefit.

Reasoning

The court held that by constructing a petrol station on the road reserve the appellant ought to have known the land was amenable to use by the government and the road authority. Payment for structures was made out of goodwill under the financier's resettlement framework, and no further compensation for land not compulsorily acquired could arise.

p. 9
03

Whether the trial court erred in failing to find encroachment on the suit property despite the two survey reports

Holding

No error. The survey reports were inconsistent as to the extent of encroachment, and the official survey maps and Land Acquisition Drawings showed the road project confined within the 30-metre reserve.

Reasoning

The court noted the two surveyors produced differing measurements (0.0178 Ha and 0.0431 Ha) and that the topo-cadastral survey showed the suit property intact. The trial judge's findings were supported by the evidence, and the appellant failed to demonstrate any misdirection in law or fact warranting appellate interference.

p. 9

Legal principles established

#
  • Land within a designated road reserve, though adjoining or forming part of a private title, is amenable to use by the road authority for road expansion and does not require compulsory acquisition or compensation for the land itself.
  • A first appellate court may interfere with findings of fact only where they are based on no evidence, on a misapprehension of the evidence, or where the trial judge acted on wrong principles.

Court orders

#
  1. 1.Appeal dismissed
  2. 2.Costs of the appeal to the 1st and 3rd respondents

The bench

#

One judgment of the whole court — no separate or dissenting opinions.

majority
majority
On appeal from
Environment and Land Court at Mombasa
ELC Case No. 234 of 2017
Jurisdiction invoked
First appeal to the Court of Appeal under rule 31(1) of the Court of Appeal Rules, 2022

Relief refused

#

Setting aside of the trial judgment and entry of judgment for the appellant for Kshs.14,925,000 special damages plus general damages

The suit property was not compulsorily acquired; the road was constructed on the 30-metre road reserve and the appellant was already compensated for structures on the reserve

p. 9

Costs

Appeal dismissed with costs to the 1st and 3rd respondents

Quotable passages

#

Verbatim from the judgment, each located to the page it appears on in the official PDF — so these can be cited and checked directly.

The road having not passed through the appellant's suit parcel, we reach the ineluctable conclusion that there was no reason for the suit property to be compulsorily acquired, and conversely, the 3rd respondent had no business in compulsorily acquiring a road reserve.
p. 9No compulsory acquisition of land within a designated road reserve
Indeed, he is fortunate to have undeservedly benefited from a sum of Kshs.6,624,600 notwithstanding the fact that he was the aggressor, having encroached on a road reserve.
p. 9Encroachment on road reserve defeats claim to compensation
Consequently, we find that this appeal lacks merit and is hereby dismissed with costs to the 1st and 3rd respondents.
p. 9Disposition - appeal dismissed with costs

Issues in the judgment

#
minor

The judgment records the 1st respondent's contract date inconsistently with the evidence, stating a contract dated 13th December 2023 while the witness produced a contract agreement dated 31st December 2013 for a project commencing May 2014.

Key timeline

#

Practical implications

#

Frequently asked questions

#

Cite this brief

#

Cite this brief

Caselaw, "Lumunge v China City Construction LimitedChina City Construction Limited & 2 others (Civil Appeal E007 of 2023) [2026] KECA 330 (KLR)", Case Analysis (2026). Court of Appeal at Mombasa, appeal from Mombasa Environment and Land Court Case No. 234 of 2017. Source: https://new.kenyalaw.org/akn/ke/judgment/keca/2026/330/eng@2026-02-27

Suggested citation format for research notes or client memos. Always verify the original judgment before relying on any point.